More picture updates. assembled the flexible fuel lines and made a gauge bezel which is done except for wiring now. Switches to override the fan relay, fuel pump cut off, and ignition cut off.
in the underbody pics you can also see the proportioning valve and stainless lines on the axle. the front half of the brake lines still need to be done.