threads
Page 4 of 9
Body work and Paint \  custom fab shops in texas

custom fab shops in texas

Body work and Paint Q & A
views 3118
replies 81
following 46
 
whynotfab   +1y
Seen a few pics around on forums of work done by Mind to Metal.. definitely some badass work!

Also, a friend of mine just started up a shop in TX, check it out at the banner below:



JDugan4859   +1y
Originally posted by rollinranger109



ok mike, without all the extra bullshit give me a straight answer

Q: How much time SHOULD it have taken?

Q: Did you or did you not tell hime it WOULD be ready for dustoff?

and dont throw in all that extra my bro went to jail crap blah blah blah



Don't forget him saying it would be done in July for that show we went to in Ft. Smith, and all the other times he said it would be done, and then the day it was suppose to be done, something would always happen so it wouldn't be.

If you don't call that fucking some one over, I really wanna know what you think is.
BigWoodyStyle   +1y
Chaotic Customs in Tomball does excellent work tell em woody sent ya
DawgsledMazda   +1y
no matter how long it took, the4 fact is he paid very little money for the work and parts he got. hell the parts on the truck I made are worth 500, then that doesnt even include the Z of the frame. that should be 1500 by itself.

tell me what part is "just tacked" ???

he got 2000 bucks worth of work for 1500, hows that ripping anyone off?

time is the only thing I didnt get done as I said. you make it sound like he didnt get what he paid for. if he would have given me more time I would have finished it. remember it left and then came back.

step up Jon and tell us what you mean by what was tacked?
DawgsledMazda   +1y
Originally posted by JDugan4859



Originally posted by rollinranger109



ok mike, without all the extra bullshit give me a straight answer

Q: How much time SHOULD it have taken?

Q: Did you or did you not tell hime it WOULD be ready for dustoff?

and dont throw in all that extra my bro went to jail crap blah blah blah



Don't forget him saying it would be done in July for that show we went to in Ft. Smith, and all the other times he said it would be done, and then the day it was suppose to be done, something would always happen so it wouldn't be.

If you don't call that fucking some one over, I really wanna know what you think is.

it should have taken 2 months tops.

due to other shit going on at the shop it wasnt done when I said it would be.

but you cant say it was a hack job. the work I did was completed, the frame Z, the arms, got all that done and back together.

the owner told me not to make a cover plate for the cab floor, said he was gonna do it himself and make a console.

so tell me without all the bullshit what the hell did he pay for that he didnt get?

he got more work than he paid for. he owes me for the step notch and watts link i made for it.

JDugan4859   +1y
Edited: 1/15/2006 1:04:56 PM by JDugan4859

How about the a/c and engine drievn compressor. That was suppose to be done by you, but it's still not done, and if left in your shop, probley never would be. I mean, I could understand if it had teken you 4 months instead of 2, but it went out to 10 months, and still wasn't done. Or how about the fact he had to go have his exauset redone, because the cat wouldn't clear the tranny x-member.

I am not the only one who thinks the welds are not good, Nathan Hale and the guys at Gas Monkey both told him they wouldn't dribe it on the road.

Or how about the fact that the body was pretty damn straight when it went in, but came out with a bunch of dents in it.

What he didn't get that he paid for was the done job that you said he was gonna get in, and no where near the time you said it was gonna take. You think he is happy about the fact he you told him it was gonna take 2 months, and it took 10, and still isnt done?

And if the price was to low, thats your fault, not his, you set the price, if you couldn't do the work for that much, you should have been up front with him, and he probley would have worked with you.

Why not step up to the plate and admit the fact you fucked this one up Mike.

How much more time did you need to finish it? He gave you SEVERAL chances to finish it, and you never made a deadline on ANYTHING.
PleasuresBurban   +1y
Edited: 1/15/2006 2:23:17 PM by PleasuresBurban

WHAT MIKE CAN NEVER GET THREW HIS HEAD IS HE IS ALWAYS RIGHT.I MEAN IS THE ODDS JUST AGAINST HIM OR WHAT? I THINK NOT.

QUOTE: no matter how long it took, the4 fact is he paid very little money for the work and parts he got. hell the parts on the truck I made are worth 500, then that doesnt even include the Z of the frame. that should be 1500 by itself.

Doesnt Make it right MIKE what dont you get?How many bridges have you burned with people? Just because they got something for a little less becuase you didnt finish it doesnt MAKE IT A DEAL! The Inconvenience ALONE to move it out of your shop to another ect...COST MONEY..COST MONEY TO TAKE IT TO ANOTHER SHOP! And in the LONG RUN cost the CUSTOMER ALMOST 2x the money.NOT ONLY the customer..BUT COST YOU MONEY! This is true because if it didnt..you wouldnt be a broke dick right now and treat people like shit and hold on to there money. You have more excuses than anyone i have ever heard on here..You should be a politician..Cause your a Fucking Crook.
BigWoodyStyle   +1y
damn jon.........tell us how you really feel
outlawcrewcab   +1y
depends on what you need done
im in Ft Worth
///DragBdy   +1y
Originally posted by BigWoodyStyle



Chaotic Customs in Tomball does excellent work tell em woody sent ya



i would have to agree..... they do excellent work