chumpchange
+1y
More progress this week. bottom, top, and sides of frame are all welded up. all factory holes and seems are welded up and smoothed out. Entire frame is ground down and striped to bare metal. body filler will start this week and hopefully the frame will be ready for primer this weekend.
And some shots of the cab floor and cut rockers.