threads
Page 4 of 7
Build-Ups \  Dually build up by Tre5 Customs

Dually build up by Tre5 Customs

Build-Ups General Discussions
views 4110
replies 69
following 32
 
tre5   +1y
some more...I moved the fuse box and computer to the inside of the cab. I also relocated the plug that is right above the tire. All the wires now enter the cab under the booster. I am leaving the ABS on this one. I'll make the shock mounts and then run tabs off them to hold the ABS module in place.Got the driver's side firewall notchedPassenger's side firewall notchedPassenger's side wheel tub in
post photo
post photo
post photo
post photo
tre5   +1y
Passenger's side wheel tub is done and Kinetik battery mounteddriver's side wheel tub doneNow it lays!Tucking a little more
post photo
post photo
post photo
post photo
TooLowSdime   +1y
did you have to notch for the tie rods on this?
tre5   +1y
Yes, even more than the 1/2 tons. Taylor makes a notchless setup now though.
tre5   +1y
it's quite in here...
post photo
blazen   +1y
love it
bigredchevy   +1y
Super sick your quick is fuck
tre5   +1y
3 weeks of work so far... but over four weeks. I took one week off in the middle of the project to hang out with my Dad while he was in town.
artsar   +1y
Truck looks sick! Love it!
still2high   +1y
Damn that looks badass! Great work as always man!