threads
Page 27 of 34
Mazda Projects \  Project Drag Star (Pg. 21 Finished)

Project Drag Star (Pg. 21 Finished)

Mazda Projects
views 38140
replies 335
following 44
 
twisted minis   +1y
I thought about it, but it will hit the bag mount.

I'm about 10 hours deep now. I hear it takes about 20 before you really get consistent.

flgatorsrule, if you really want Nissan arms that bad then they are going to be $275 shipped in the US with everything but a stock cross shaft.
usmcperez   +1y
looking good Seth!
slammedyota91   +1y
Damn!
usmcperez   +1y
email sent slammed.
racer x   +1y
Truck is looking good seth.
toddluck   +1y
cool cool seth
dropped90(justin)   +1y
i cant get over how sick of a tread pattern those tires have on them.





-justin
toddluck   +1y
theylook like flames