threads
Page 4 of 9
Mazda Projects \  89 4.3 Mazda B project

89 4.3 Mazda B project

Mazda Projects
views 18711
replies 83
following 24
 
reflectorcollector   +1y
ok i got the tranny member mocked up and my welder ran out of gas. My dad is going to weld it up at work tomorrow plus bring me home a full bottle of gas! YAY! I also got to take some better pics of the motor mounts from up under my truck while it was on my lift.

You can see in the pics that the tranny member i was working with was way the f off so i had to cut it, shorten, and re-angle it. I also had to cut the mounting plate and re-angle it as well. I will take more pics of the tranny member tomorrow when i got it mounted.

thread post photo

thread post photo

thread post photo

thread post photo

://i160.photobucket.com/albums/t179/turbob2000/DSCN0302.jpg
2fine89   +1y
Lookin good !
racer x   +1y
Lookin good.It'll be running like mine in no time.
reflectorcollector   +1y
thanks guys! It would be running very soon if i had unlimited cheese! I still have to purchase the wiring harness from painless, have the ECM reprogrammed, custom driveshaft, custom exhaust, and fuel cell to get it on the road.

My dad welded up the tranny member at work today and brought it home and it looks very nice! I will update more later with some pics!
reflectorcollector   +1y
oh quick question....what size fuel line should i use for the feed and return. I want to run hard lines from the fuel cell to the motor.
quadmasta   +1y
6AN, whatever that is
reflectorcollector   +1y
thanks brian...so that should be sufficient? Looks to be 3/8" hard line from researching on Summit's website
90-b22dawg [andrew]   +1y


how much did you get it for? i guess i got lucky when i found my ex 4x4 bed.... will have to come out one weekend and throw a few back with ya and possibly talk about pricing the work for baggin mine (after you get your truck on the road)
90-b22dawg [andrew]   +1y
that hard to find huh? ill keep an eye out for the 4x4 sheetmetal for ya....