threads
Page 23 of 42
Mazda Projects \  PROJECT:- SETBACK

PROJECT:- SETBACK

Mazda Projects
views 31392
replies 414
following 51
 
sleepyspeed   +1y


you mean in like the door openings? If so I haven't trimmed them out yet, I have some curved steel I am going to use to make the BD look like it isn't there at all(sneaky)....lol

also I will get pics up tomorrow on the front wheel tubs and shave panel. got the pass. side all tacked in tonight but didn't have camera batteries. The drivers side is all prepped except the little bucket I am going to make around the clutch master.
speedster93b   +1y
wow man truck's come quite a ways!! lookin good. under 5k is a pretty respectable build budget!!
sleepyspeed   +1y
okay here is all I got for tonight, rain and lightning are holding things up tonight

thread post photo
frocashmoney24   +1y
shaweeeet makes me wanna start working on mine again!! whats next for plans
sleepyspeed   +1y


what's next? the whole truck....lol

anyways its crappy outside again so here's a little something for ya.

GK fillers have the compound upper body line right?

well so do my cheapo's now

blury side by side of before and after
thread post photo


another view
thread post photo


fitment looks decent, shows how evenly trimmed the cheap versions are good thing I have a welder
thread post photo


and the pair done
thread post photo


still a little fine tuning will be done before mounting them but they are damn close for the money
mazdawg(mikey)   +1y
so when you making me a pair?
sleepyspeed   +1y


Lol!... well I guess it could be arranged. they would have to be before I weld mine on the truck. I want to do more but need to get some corners off of a bed so I have a template to match them too. but at that no two beds are exact so they will still need a little love
bodied b2600zx (josh)   +1y
very nice man! !

-Josh
speedster93b   +1y
they look like they'll fit nice
dropped90(justin)   +1y
lookin really nice man





-justin