I bought my mazda on oct 3rd, pulled in the garage on oct 10th... Working on bagging it, and shaving will come later... I am going to try to have the back done/and truck back on the road by halloween for some draggin and then back in for the front. I havent even drove the truck yet. besides bringn it home. I'll try to keep this thread updated daily with new pics, or as soon as new things are done...
I will be running re7's in rear, and re6's in the front, chrome FBI 4 link, with bag over axle. I have 8-3/8 valves and 2-1/2 valves, I'm thinkin of buyin 2 more 1/2's and doin 1/2 fill and 3/8 dump. Otherwise I'll prolly use the 1/2 valves on the front with my 3/8 dumps. and the back will be all the 3/8's idk yet. Still need to purchase a couple compressors, I will be getting 2 viair 480's probably. I have a 12 gal tank, that will going in the bed or on the frame, still havent decided.
this is what i startd with
Driverside Notch
Passenger Side