ok so the site was down and i found my self in the garage for just about the whole day... me and my dad and a friend got my 4 link all mocked up and found a few little thing that need changing, but nothing major... these first two are just my dad welding..
these are of the whole thing mounted.....
and a side view of how they mount to the frame....
and this one is where it needs some work....at ride height every thing lines up perfectly.... but when i rise it up to laid out height, the top two bushings bind up a little bit... its really hard to tell from this pic but they do bind up.... I'm thinking its because i have to much triangulation, and i need a super pivot bushing... but if I'm wrong feel free to correct me....
and this one make me feel a lot better... i thought i was off on my notch by and inch or so... but come to find out it was only by 1/4 inch... so I'm just going to move my top bracket over and make it line up instead of modifying my whole notch kit..... thank god loll