Well its not gonna be done before harvest drag... I have now learned that these endeavors we call projects, take much longer than expected... LOL ANYWAY here is where I am now.. i spent all day yesterday at the eye doctor....
Oh yeah I forgot to take a pic of my bags, but i went with airlift 2b7 single ports for the back, and im gonna use 2b6 singles up front...
I just found out im gonna have to notch the drive shaft crossmember.. CORRECT? I can stand on the back and the drive shaft is hitting the crossmember and the frame is still 4" off the ground..