90yota
+1y
heres some updates from the past few days..... got all the tube work welded, gas tank mounts, air ports, and also put on some threaded pads around the rails to mount air/fuel/brake lines....other than the rails, everything has been tig welded ^^^frame gussets installed, and rear shock mounts tacked in (still gonna add a few more gussets to the shock mounts)^^^plates welded in to reinforce upper control arm mounts, as well as tube put onto the lower control arm mount.....you can also see some of the upper shock mount^^^cab came off last night ...frame is headed to blast this weekend...fabbed up a new battery mount as well^^^and the "poser" shot of me tig welding on the bed mounts^^^