Krisko
+1y
I wish I could post pics of the work I did this weekend, but my new phone hasn't come yet and I can't find my camera anywhere.. I did post some I had before the whole 'hood through the phone' trick.
So, this weekend (aside from spending Saturday down on Lower Greenville for St. Patty's day, which was a cluster fuck of epic failure due to all the drunk retards and cops everywhere you looked..) I managed to get my tires for the front wheels, got my front frame notched for lower control arm travel, got all my brake parts painted and installed, finished plumbing the valves, started running my control wiring, relocated my battery, and trimmed all the metal on the firewall for the 22's in the front. So needless to say the front is just waiting on the upper bag brackets and the acual bags. I am picking up my watts link from Dallas Hotrod Parts this week and my axle is almost done getting narrowed at ET Automotive, should be ready this Friday. Since I already took off this Friday from work and not attending Bayou, I'm committing myself to having the rear end installed, watts link, bags, plumbing and controls done over the weekend..
Fabricated a new battery tray out of some angle we had..
Painting the Yota calipers..
Cut the factory wheel wells out, getting ready to tub the firewall for them big ol' 22x7.5's
Painted the calipers, spindles and the battery holder I made..