josh
+1y
well i was called upon by a good friend and severed petitioner to rebag and re metal work his 04 (i think) crew cab long bed cummins dually.
plans are; new notch, bridge, gooseneck hitch, x-members, semi-bags over the axel, parallel 4link with watts link. new carrier bearing member, new tranny member, z the front to lay flat, raise the upper arms and possibly new uppers. new bag plates in the front. shocks all around. all set up for a 305/35/24. wheels should be on by the time it rolls out. and stretch the dually fenders as well. all before tex-mex. i hope....
on to the pictures of the bed off and cutting out the junk.
it had what i belive to be a avs y link. it had so much play in every way possible i cant belive it didnt rip the front mounting point off!
these are the lower mounts. they were burned in so hot, and undercut so bad they actually started to rip the frame. alos it was gusseted in the wrong spot!
so we went ahead and cut out all the junk. (notch and bridge) so much perosity in the welds i cant belive it held as long as it did.
cut off the lower mounts on the frame past all stress cracks and fixed the holes.
then made some patchs out of 3/16ths (frame is only 1/8th thick) and welded them in.
thats all i have for today. picking up the 2x4x.250 for the notch and frame extensions that we had to cut out monday. so it should have some good progression this week.
remember this isnt my full time job so i only get to be in the shop 3-4 hours after my full time job and on the weekends.
josh