maztang (ryan)
+1y
Thanks man, I'm working on it lol. Everything has been or is getting replaced. Bobby at Sadistic Iron Werks is in the process of building my control arms with uniballs, I just had the engine rebuilt, went through the tranny again, replaced the front seal and gear oil in the rearend, all new brakes, new 480 compressors, new 8 1/2 gal aluminum tank, moved all 8 valves in teh cab to help in the winter time to keep from freezing and I am running the dump lines outside the cab, running all copper tubing for airline, dynamatting everything, spray in bedliner on the cab floor, and the list goes on and on lol. Here is the rendering