bottom of swirl pot ready for welding. Ive got about 2.5 hours in the damn dome. Shouldnt have used such thick aluminum.
thats not gonna work. Damn monster truck tires.
thats mo betta. Yep im gonna do some cutting on these to shed some lbs.
started the final caB - clip attachment point.
and made a tool to flare the ends of my coolant tubes.