75dually
+1y
So after church today I got to finish up some of the welding on the notches. Then after that I got out the plasma torch and went to work cutting out the frame rail.
I now have to make the plating for the frame rails to box everything in, but that is going to have to wait for another day. Once I get those made I will do all the finish welding and then do some grinding to clean up all those welds.
Been trying to think up some cool design for the bridge, ok nothing like the amazing work the guy in Canada did, but something that will look good. Although I do plan on covering it up with sheet metal when the bed get put back on, I still want it to look good none the less.