Thanks bro, much appreciated, I'm as anxious as all the bscener's that have been following this thread, prolly moreso now than in the past, the fruits of all the cold beer & sweat are fixin to be realized (not to mention the boat load of $$ I've thrown at it), I just hope it's worth it all, please keep in mind that it won't be perfect by any means, it still will need some body massaging, but I guess that it is like a woman, get the motor reved up, and all they want is a body massage!! lol haha!
pardon the soap opera, I kinda figured it like the old batman shows, "stay tuned to see the next episode, same bat time, same bat channel" lol
nuff of the yackin, I know everyone just loves the thread for the pics.....haha..I didn't get to mount up the intake to the engine & carb's yet, the wife wasn't feeling to swooft when I got home, but I did get a few of the for the most part finished product, flanges need planeing, and I'm gonna do a little polishing and shoot a coat of clear on it to keep it from tarnishing, once that is done hopefully this weekend I'll get the carbs mounted up & snap a few more pics....
round tube/log is for the coolant to the heater core, small log is for the dizzy vaccum
hence the 1/8npt hose barbs. I have some nice red silicone vac hose for these.
3/4" square log on top will supply vaccum to the brake booster and the pcv valve.
these will also have some nice red vac hose, there is some in one of the engine bay pics earlier in the post...
nother shot of the coolant & dizzy vac logs.
and here is one of the steering wheel I got, it ought to blend in nicely with the polk/momo sub and shifter
Hope everyone enjoys, stay tuned to "As the Mazda runs" for more updates lol haha!!