threads
Page 5 of 46
Mazda Projects \  87 Mazda B2000 project, DONE!!!

87 Mazda B2000 project, DONE!!!

Mazda Projects
views 72573
replies 452
following 83
 
tre5   +1y
More stuff done. Body drop is cut. The back wall is mostly welded up. The firewall and a/c stuff has been clearanced. I actually had to trim the blower to keep it from hitting the tire. The lower links are made and mocked in place. The truck is still off the ground a little. I need to get some drop spindles on the front and c-notch the rear. Getting the firewall and front tubs in should be real fun. Here are the pics.
thread post photo

thread post photo

thread post photo
tre5   +1y
And for my motivational pics...
thread post photo

thread post photo










And it isn't even all the way down yet.......maybe when some of the camber is gone with the drop spindles and the truck is flat on the ground I might get a lug nut up in there.
josh   +1y
fucking beutiful man. i love it.

josh
lowb2200   +1y
thats sweet man its coming along nicely
crazymikey   +1y
that looks freakin sweet. Such clean fab work.
Ê”r333xxh4v0kÊ” (brent)   +1y
i didnt know about those wheels. but now that i see them up on the truck, i give you thumbs up man. those are sweeeeeeeeeeeet!
tre5   +1y
Well its been 2 weeks since I posted updates. My excuse is... I was on vacation for 8 days. Anyway, people have been askin, so here are some pics. I have the cab almost done. Just need to do the other wheel well/ tub, whatever you want to call it. I am kinda tired of seeing trailor fenders on everyone and their mothers truck. So I did something a little different. If you noticed in previous posts, I cut around the stock wheel tubs. This is why... I raised the stock ones up, and filled in the bottom. The plan is to body work the welded seam, then paint, then rhino line the wheel tub area to avoid rock chips in the paint. The truck is going to be black, so it should look good I think.
thread post photo

thread post photo

thread post photo

thread post photo
sleepyspeed   +1y
good way to get it done and be different. Those wheels are sic on the mazda
tre5   +1y
Well I got the passenger side pretty much done tonight. I really need to start busting tail on it now. It is scheduled to be painted on the 8th of November. The guy I am having paint it came over tonight to check it out. I am going to have the body off the frame by Saturday so the fire wall can be body worked and painted. Still need to finish the rear, make the new a arms in the front, and get the hydros in. Plus all the little stuff which will take longer than anything else.
tre5   +1y
This weeks progress...
4 link is done. C-notch is done. Cab is off and going to paint with all the other panels tomorrow. This next week should be new custom upper and lower control arms.
thread post photo

thread post photo

thread post photo