Well I have the rear 4 link finished up. Also the c-notch. Only thing left to do on the rear axle is the cylinder mounts. I am waiting on some backordered parts for these. I am not just drilling out som plates and throwing the cylinders in. I am mounting them upside-down with a bushing. I also started cleaninig up the front frame in preperation for the new front end. Not much to see there so no pics of that stuff yet.
UP.
DOWN.
CENTER PIVOTS. (for some reason the tube looks bent in the pic, but it's not. It's 1 1/2" .120 wall chromoly, so it won't bend easily either.
Another shot of it down.
Hitting a side.