I went outside this afternoon after dreading finishing my floor pans for days and finally got my driveshaft tunnel done. I have a few small areas around the edges that need to be worked and tacked but I'm going to wait untill I get the cab off and can get at it from the under side. The only thing left other than that is the small piece of 2" wide 1/4" stock I used to hump the floor pan brace over the driveshaft needs a piece made to cover it and connect the sections of tunnel. I'm going to wait till I get it back to the shop for that so I'll be able to use the English wheel to work a piece to blen it all together.
I just have to put a few more tacks on the sections of 4 link that are already on the truck so the axle will stay under the truck while we load and unload it and its ready to load up and move for final tear down.