threads
Page 11 of 86
Mazda Projects \  ***SkrapinSask from stock to layin frame***

***SkrapinSask from stock to layin frame***

Mazda Projects
views 152390
replies 852
following 95
 
mazdaman82   +1y
hells ya man nice table......wish i had a table to work on somethimes
skrapinsask   +1y
Bout to hit the garage for a few hours. I looked at some of the Dewalt grinders but they only have 1 year warranty and the 3 and 5 year warranty Canadian tire offers on their mastercraft products is very hard to beat. Basically every 6 months i get Brand new grinders
mazdaman82   +1y
sweet get out there and get something done man...lol
baggd   +1y
Looks good. Hope to see more pics soon!!!!
skrapinsask   +1y
Front frame rails are completely stripped of everything that needed to be remove for upper bag brackets. still need to fill holes in frame and cap off lower control arm mount pocket and upper control arm pocket.

skrapinsask   +1y
Well guys tonight i pulled my box so i can start dealing with all the useless factory components underneath





i also gotta deal with those nasty cab dents some time
oldspice213   +1y
oh yes that looks very familier haha
skrapinsask   +1y
Put in a little time today after work. Pulled the shocks, fuel tank and un did the harness



Alright so how do you guys suggestme starting the air portion of my build? Finish the front and then build the rear off the lift/height of the front? do both at the same time?
mazdaman82   +1y
the best way to do something is to do it to the end, imo i thank you need to finish up the front first, befor you start on the rear
mazdadropped   +1y
well first off take those ugly leaf springs off and ya finish the front unless your doing a full frame build